Approved drainage 2020/21 capital programme
2020/21 maintenance of highway assets
2020/21 Programme: Drainage
Project name/location | Division | District | Project description | Estimate |
---|---|---|---|---|
Higher Lane, Dalton, Phase 2 | West Lancashire East | West Lancashire | Catchment study, and a new trash screen to follow on from the extensive repairs in 2019/20 | £50,000 |
New Cut Lane, Halsall, Phase 2 | West Lancashire West | West Lancashire | Phase 2 of this long-term project to install new drainage, manholes and gullies | £50,000 |
Priest Hutton Highway Drainage Improvements, Phase 2 | Lancaster Rural North | Lancaster | Further works as identified by 2019/20 investigation/study | £15,000 |
Mossy Lea Road, Wrightington, Phase 3 | Skelmersdale East | West Lancashire | Complete outstanding works on this scheme | £10,000 |
Castle Lane, Ormskirk, Phase 2 | West Lancashire East | West Lancashire | Improvements to surface water drainage system and repair to water damaged carriageway | £80,000 |
Wallace Lane, Phase 2 | Garstang | Wyre | Following detailed investigations in Phase 1, installation of new diampipe across the field with associated access chambers | £70,000 |
School Lane Culvert, Forton, Phase 2 | Wyresdale | Wyre | Replace broken stone deck slabs, and repair downstream headwall and retaining wall | £80,000 |
North Street, Strongstry | Rossendale South | Rossendale | Trace, upgrade and adopt all highway gullies to ensure future maintenance and manage surface water flood risks | £50,000 |
Whalley Road, Billington | Ribble Valley South West | Ribble Valley | Identify location, capacity and the condition of surface water drainage network. Identify preferred option for improving rate of discharge to the main river | £15,000 |
High Road, Halton | Lancaster Rural East | Lancaster | Options review for future works which are likely to include upgrading the existing drainage system in a further phase | £10,000 |
Project Development | As necessary | As necessary | Allocation for the design and development of future schemes | £70,000 |
Forecast Outturn Capital Expenditure: |
£500,000 |